• CT4, Tòa nhà Vimeco, Nguyễn Chánh, Cầu Giấy, Hà Nội
  • info@sbc-tt.com
    • HOTLINE TƯ VẤN
    • Tư vấn kỹ thuật sơn: 0934518468 (Ms. Thoa)
    • Tư vấn bán hàng Sơn: 0973883409 (Mr. Quyền)
    • Tư vấn sàn sp deck: 0941460336 (Mr.Ninh)
    • Tư vấn tôn lợp: 0916688189 (Mr. Hiếu)
  • Việt Nam English

SP®FIRESHIELD - FS1

MSP:

Mô tả Sản phẩm

·      One component paint, naturally fast drying so easy to use and save.
·      The flexible paint film should not be easily cracked or damaged by the rain like water-based paint which is suitable for construction right at the factory and erection on the construction site.
·      Excellent adhesion on metal surfaces as well as on primer surfaces.
·      Special solvent system helps paint film dry quickly, save construction time.
·      Fast to achieve thickness and easy construction with basic equipments.
·      Protecting the structure of the building from melting and collapsing when the flame temperature is higher than 1000°C.
 
  • The painting surface should be dry, clean, free from any other impurities. Metal surface should be treated in accordance with ISO 8504.
  • For surface of new untreated steel: Grade of cleanliness is Sa 2.5 (ISO 8501-1: 1998). Mechanical cleaning up to the minimum standard of St2 (ISO 8501-1: 1998) may be acceptable depending on the intended use.
  • For temporary primer-coated steel surfaces: The appropriate temporary primer coat surfaces should be clean, dry, free from contamination and free of any foreign matter, such as oil and grease.
  • For surface had old painting layer: The appropriate primer must be dry, clean and free from decomposition.

• SP®FIRESHIELD - FS1 paint coating should be applied directly onto the steel surface or the anti-rusted primer therefore to ensure adhesion as well as properties of flame resistance paint, metal surfaces need to be coated with anti-rusted primer as recommended by the SP paint manufacturer.

• Please contact the supplier for advice.

  • The working surface temperature must be at least 100C and 50C above the dew point of the air. Working environment moisture ≤ 95%.
  • The construction area must be well ventilated.
  • Drying time depends on temperature, humidity, ventilation level of construction environment. High temperature and good ventilation helps to dry faster.
  • Stir well before applying. Only mix up to 5-10% SP®THINNER 500 if necessary.
  • Can use spray gun, brush or roller.
  • Use the right ratio and type of solvent recommended by the supplier.
  • When applying spray gun, use airless spray gun with high spray pressure, from 3000 - 7000 psi. Equipment after construction must be washed with a suitable solvent.

Sản phẩm liên quan

Liên hệ với chúng tôi

Sản phẩm mà bạn quan tâm

Tên sản phẩm:

Mã: